Implemented projects
Below a brief list of implemented projects is introduced:
-
The study of seismically active structures (earthquake sources) for the Khudoni hydropower plant design
-
Geological survey of the landslide zone of Tskneti-Samadlo road
-
The study of tectonic setting, geological structure, neo- and seismotectonics of Achara for detailed assessment project on seismic risks within the areas allocated for the construction of Batumi skyscrapers
-
The study of tectonic setting, geological structure, neo- and seismotectonics of Achara for detailed assessment project on seismic risks within the areas allocated for construction of bridges on the rivers Toneti, Khevi and Khrami
-
Development of private entrepreneurship and small business based on mineral resources accumulated in artificial water reservoirs of Georgia
-
Geological map of Georgia, scale 1:500 000 (Georgian-English)
-
Geological map of the Caucasus, scale 1:1000000 (English)
-
The map of seismically active structures of Georgia, scale 1:500 000 (Georgian-English)
-
The map of magamatic formations of Georgia, scale 1:500 000 (English)
-
Quaternary geology map of Georgia, scale 1:500 000 (English)